Bespoke cabinetry, worktops and full remodels. Cabinets built to your kitchen's real measurements, and worktops templated against what is actually installed.
EXCELLENT Based on 624 reviews Posted on Google fırat aziretTrustindex verifies that the original source of the review is Google. Mohan and Husnin made amazing job in my apartment. Very tidy, and expert. Very satisfied with the wefix servicePosted on Google Matthew PettyTrustindex verifies that the original source of the review is Google. Muneeb and Sheikh were great. They arrived on time, did a great job and tidied up afterwards.Posted on Google Seungeun ChoTrustindex verifies that the original source of the review is Google. Prakash and Shajahan they were so amazing, always perfectly on time. Everything was fixed in 2 days they also cleaned after fixing!!! We are so grateful. Thank you guys!Posted on Google SHERYLL LIBANTrustindex verifies that the original source of the review is Google. Amazing work, fixed my ac control perfectly! Thanks to Kuya Sheikh and Kuya Wilfredo for the job well done!Posted on Google Daisy BigginsTrustindex verifies that the original source of the review is Google. Anid and waseem did a brilliant job of hanging pictures and decorations for our house in a timely manner!Posted on Google Abhinav GuptaTrustindex verifies that the original source of the review is Google. We had a plumbing issue in our new house . we consulted few other companies before Wefix but nobody was able to find the root cause. However their team was the only one who were actually able to figure it out and give us a logical solution. the plumbing team consisting of Om prakash and shah jahan is very knowledgeable. I cannot recommend them enoughPosted on Google LauraTrustindex verifies that the original source of the review is Google. Imagine waking up and seeing the tiles on your terrace start to rise like a mountain. See my videos. After the rains and the start of this extremely sweltering summer, we had issues (not for the first time). But the best part about these guys was the cleaning 😆 They left the terrace cleaner than our gardener does. 😄😀🥲😄Posted on Google Jane QassTrustindex verifies that the original source of the review is Google. The team Muneeb, Rasel, Shaikh did an amazing job, removing my old AC unit and installing a new one in just 2 days!!! Very professional,clean and great job! Highly recommend!!!Posted on Google єlнαωαsѕ DZ الحواسTrustindex verifies that the original source of the review is Google. Hussnain and Sadik were amazing. Professional and attentive to details. Thank youPosted on Google wyTrustindex verifies that the original source of the review is Google. Ghulam and Ronal good work, very detailed, satisfied with the work!Verified by TrustindexTrustindex verified badge is the Universal Symbol of Trust. Only the greatest companies can get the verified badge who has a review score above 4.5, based on customer reviews over the past 12 months. Read more
Kitchens in Dubai take a beating from humidity cycling and heavy daily use. These are what we get called about.
Hinges wear, doors swell and drop, and carcasses go out of square. Once several doors have gone the same way, replacing hinges is buying months rather than years, because the carcass underneath has usually moved too.
Laminate splits at the sink cutout where water gets into the core. Marble stains and never fully recovers. A worktop change alters how the whole kitchen reads more than anything else you can do, which is why it is the most common partial job we quote.
Small-format tiles and darkened grout from the original build. New large-format porcelain changes the room in two days, and it pairs naturally with a worktop replacement since both come out together anyway.
Cluttered counters are usually a design problem rather than a habit problem. Deep drawers, pull-out pantry units and corner carousels hold far more than the same space in fixed shelving, and most original Dubai kitchens were built with neither.
Which puts your own shadow across every work surface. Under-cabinet strips and lighting over an island cost very little during a renovation and change how usable the kitchen is.
Sink, hob and fridge placed for the plumbing rather than for cooking. Some of this can be fixed by moving services, and some needs the wall to come out, which we will tell you plainly at the survey.
Secondary market apartments in Dubai almost always have the original kitchen. Doing it before you move in is far easier and cheaper than living around it later, so it is worth pricing before you complete.
Full kitchen renovations and targeted upgrades
Everything out and everything new: carcasses, doors, worktop, tiling, sink, taps, lighting and appliances. The right choice where the plumbing runs are tired or the layout has never worked.
New cabinets built to your measurements in your chosen finish, keeping the existing plumbing and electrical positions where they are serviceable. Leaving the services where they are takes a lot of cost and time out of the job without compromising the result.
The highest-impact partial job. Templated on site, fabricated to that template, fitted with the sink and hob apertures cut precisely. Combined with a retiled backsplash, it transforms the kitchen without touching the cabinets.
Taking out the wall between kitchen and living space. This is structural work, so it needs proper assessment and approvals before anything happens, and we go through exactly what your building and community require at the survey stage.
Extra preparation space, storage underneath and somewhere to sit. Islands need power and sometimes plumbing brought to them, which is straightforward during a renovation and disruptive afterwards.
Where the carcasses are sound but the finish is tired. A professional respray in a new colour, new handles, a new worktop and an updated backsplash get most of the effect of a new kitchen for a fraction of the cost.
Design approved first, fabricator booked before we start, and the worktop templated against what is actually installed.
We measure, talk through how you actually use the kitchen, and produce a 3D design. You approve the layout, the finishes and the appliance positions before anything is built, because a cabinet run is expensive to change once it exists.
Cabinet finish, worktop material, tiles, sink and taps chosen. We order everything and book the worktop fabricator before we start, since fabrication has a lead time and a kitchen sitting without a worktop is a kitchen you cannot use.
Old kitchen out, first fix plumbing and electrical, carpentry installed, worktop templated and fitted, tiling, second fix, appliances, then snagging and handover. The worktop is templated against the installed cabinets rather than against a drawing, which is the only way to get a joint that actually sits flush.
Worktop material moves the number most. The same kitchen in laminate and in natural stone are very different quotes, which is why we price after you have chosen rather than assuming a grade.
The survey, the 3D design and the quote are free. The quoted price is the final price, and anything found once the old kitchen is out gets shown to you and quoted before we proceed.
Send us a photo of your current kitchen and tell us what you want to change. We’ll visit, measure and produce a 3D design (if required) with no obligation to proceed.
Our carpenters build cabinets to the actual dimensions of your room. Flat-pack units get shimmed and filler-panelled into the gaps, and every one of those gaps is somewhere crumbs live and doors sit slightly out of line.
The template is taken against the installed cabinets, then the stone is cut to it. Fabricating from a drawing is how you end up with a visible gap at the wall, which no amount of sealant hides.
3D design covering layout, finishes, appliance positions and lighting, approved before we build. Changing your mind on a screen costs nothing and changing it after the carcasses are made costs a great deal.
Carpentry, tiling, plumbing, electrical and worktop coordination under one project manager. No gaps in the sequence waiting for a trade that has not turned up.
Removing a wall is not a cosmetic decision. We tell you what your building requires, what has to be assessed and what approvals your community needs before anyone talks about timelines.
Full scope and material specification agreed before we start, naming the actual products. The contract price is the final price unless you change the scope, and any change is agreed in writing first.
Quartz, marble, granite, solid surface and laminate worktops. RAK Ceramics tiling, Grohe taps, Danube Home and Progress Profile finishes, and the other suppliers standard in Dubai
Split, ducted, central, VRF, VRV, cassette and window units.
| What to compare | WEFIX | Typical Dubai contractor |
|---|---|---|
| Cabinets | Built to your measurements on site | Flat-pack shimmed and filler-panelled |
| Worktop | Templated against installed cabinets | Cut from a drawing |
| Design | 3D approved before building | Sketch or a photo from a catalogue |
| Materials | Ordered and fabricator booked before start | Ordered as the job progresses |
| Structural work | Assessment and approvals explained upfront | Wall removed, questions later |
| Specification | Every product named in writing | “Quality materials” |
| Trades | All under one project manager | Subcontracted per trade |
| Warranty | 1 year | None |
We back every job we do. No exceptions.
Same fault comes back, We fix it free of charge.
You see the full quote before we start. No surprise additions on the bill.
Call or WhatsApp now, we aim to be with you as fast as we can.
We renovate kitchens in apartments, villas and commercial properties across every Dubai community.
A respray with a new worktop runs AED 5,000 to 12,000. Cabinet replacement with worktop and backsplash is AED 18,000 to 45,000. A full gut renovation with layout changes and premium materials starts around AED 40,000 and goes up from there. You get a fixed written quote once we have measured and you have chosen materials.
Two to three weeks for a full kitchen. A worktop and backsplash upgrade is around a week. A respray is three to five days. The worktop fabrication lead time is the part that sets the schedule, which is why we book it before starting rather than after.
Yes, before anything is built and before you commit. It is the most useful stage of the whole project, because layout problems are obvious in 3D and invisible on a plan.
Sometimes — it depends entirely on whether the wall is structural. That needs proper assessment, and in most Dubai buildings it also needs approvals from the Municipality and an NOC from your developer or building management. We tell you at the survey what your specific property requires and who has to obtain it, so the project does not stop halfway waiting for a document nobody applied for.
Not for a like-for-like replacement. Anything structural, and most changes to plumbing or drainage routes, will need approval, and almost every tower and community requires an NOC before renovation work starts regardless of scope. We go through what applies to your property at the survey.
Yes. We template on site, fabricate to that template and fit, with the sink and hob apertures cut precisely and edges polished. Quartz, marble, granite, solid surface and laminate.
Yes, as part of the renovation. Tell us the models early, because appliance dimensions affect the cabinet build and it is much easier to design around them than to adjust afterwards.
Both. A respray with a new worktop is a common job for us. Partial work is often the better decision when the carcasses are sound, and we will say so rather than selling you a full kitchen you do not need.
High gloss, matte, wood grain, painted and lacquered, in any colour. We bring samples so you can see them in your own kitchen light before deciding.
Yes, one year on workmanship from handover, covering carpentry, worktops, tiling, plumbing and electrical.
The survey, the 3D design and the quote are all free. You approve the layout on screen before a single cabinet is built.
| Cookie | Duration | Description |
|---|---|---|
| cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
| cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
| cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
| cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
| cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
| viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |
